Solar PV, wind and energy storage
Solar and storage projects use this equipment to connect generation and collection systems to the grid. We configure protection, metering and interlocking according to the project grid code and utility requirements.
Substations & Transformers
Step-up Grid-Connection Prefabricated Cabin
Factory-assembled step-up and grid-connection cabin for solar, wind and battery storage projects.
Product Overview
Step-up grid-connection prefabricated cabins are used in energy storage and power generation systems to connect solar, wind and battery units to the utility grid. The cabin integrates an incoming-line compartment, a step-up transformer compartment and a grid-connection compartment in one containerized module, reducing on-site installation work and shortening project commissioning time.
The grid-connection control system is equipped with anti-islanding protection to ensure safe and reliable disconnection from the grid when required. The container-type enclosure provides high structural strength and IP55 protection, with factory assembly and commissioning completed before shipment.
We configure the transformer rating, protection scheme, metering and grid interface according to the project grid code and utility requirement. Each cabin is supplied with drawings, test records, export packaging and commissioning support.
Before production, our engineers review the project single line diagram, protection scheme, metering requirements, cable entry and local grid standard. After approval, we complete factory assembly, routine testing, export packaging and documentation, and provide commissioning and after-sales support after delivery.
Technical Specifications
| Product Model | Step-up Grid-Connection Prefabricated Cabin |
| Product Type | Prefabricated step-up and grid-connection cabin |
| Rated Voltage | 10 / 35 kV |
| Rated Power | Up to 6 MVA |
| Enclosure | Containerized / IP55 |
| Standard | IEC / GB / CQC |
| Rated Frequency | 50 / 60 Hz |
| Standards | IEC / GB / CQC / CB |
| Factory Testing | Routine testing before shipment |
| Export Options | Transformer rating, voltage level, incoming line, protection relay, anti-islanding device, metering and grid code |
Applications
Solar and storage projects use this equipment to connect generation and collection systems to the grid. We configure protection, metering and interlocking according to the project grid code and utility requirements.
Utility substations require reliable switchgear for incoming supply, feeder protection, metering and bus coupling. This product is configured to operate safely under normal and fault conditions, with drawout or fixed units selected according to maintenance requirements.
Industrial plants use this equipment for main incoming supply, transformer feeders and motor circuits. The assembly is designed for continuous industrial duty and can be customized with protection, metering and control options for process reliability.
Commercial buildings need compact switchgear that is easy to install, operate and maintain. This product supports main distribution, metering and feeder configurations for retail, office, hotel and mixed-use developments.
Why Choose Haiyue
We review your single line diagram and confirm the Step-Up Grid-Connection Prefabricated Cabin configuration, protection and busbar arrangement before production.
Every panel is assembled, wired and routine tested before shipment, with test records included in the delivery documentation.
Switchgear is packed for sea or air freight with drawings, material certificates and shipping documentation.
Commissioning and after-sales support are available. Overseas installation is not included.
Certification & Testing
This product is manufactured according to IEC and GB standards, with CQC and CB certification available for relevant configurations. The factory operates under ISO 9001, ISO 14001 and ISO 45001 management systems.
Before shipment, routine testing includes mechanical operation, insulation and withstand checks, wiring verification and functional protection checks. Type test documentation can be shared after technical qualification.
Procurement & Lead Time
Send your required voltage, current, single line diagram, protection and metering requirements, quantity, destination country and target delivery date. Our engineering team normally responds within 24 hours.
Standard configurations can be produced within 30 working days after drawing and material approval. Custom configurations are confirmed after technical review.
Overseas installation is not included. We provide commissioning support and after-sales technical service based on the project agreement.
FAQ
Yes. We can configure the transformer capacity and voltage level according to the project generation capacity and grid connection requirement.
Yes. The grid-connection control system is equipped with an anti-islanding device to support safe and reliable grid connection.
Standard step-up grid-connection cabins can be produced within 30 working days after drawing and material approval.
We provide drawings, factory test records, material certificates, export packaging details and shipping documentation with each order.
Send your voltage, current, configuration, quantity and destination country to our export team. We review the requirement and normally respond within 24 hours.
Request a Quote
Send your project details to Leo Liu. We review the technical requirement and provide a quotation with drawings, lead time and export documentation list.